Structural Inspection Reports in Shreveport

A home sale runs on paperwork, and foundation paperwork is the kind that kills deals at the eleventh hour — or gets them renegotiated by the thousand. We produce the documentation Northwest Louisiana lenders, buyers, and title companies actually accept, on the timeline a closing actually requires.

When You Need a Foundation Report

What's in Our Reports

Every report starts with the same field work as our free inspection: a floor-elevation survey taken with a digital level and drawn as a diagram so highs and lows are visible at a glance; exterior crack mapping with width measurements and dated photos; interior symptom notes; a crawl space check on pier-and-beam homes; and a drainage review, because on our clay the water is usually half the story. Then comes the part transaction paperwork needs: an opinion on whether movement is active or historic, what caused it, what repair (if any) is warranted, and what it would cost — written plainly enough that an out-of-state underwriter can follow it.

Standard turnaround is 24 to 48 hours from the visit, and we prioritize closing dates. When a deal has nine days left, we don't sit on it for nine days.

Engineer-Stamped Letters, Done Right

Some recipients want more than a contractor's report — they want a letter from a licensed professional engineer. Louisiana law is clear that only a PE can offer stamped engineering opinions, so we don't cut corners: our field data goes to structural engineers we work with regularly, who review it, stamp the letter, and put their license behind the conclusion. That covers the lender-required "engineer letter," the manufactured-home foundation certification, and the structural review that accompanies larger repair scopes.

And the honest corollary: when a house doesn't need repair, the engineer says so. That's the report that lets a seller sign a disclosure without flinching, and it's worth exactly as much as the times we do find something.

What Reports Cost

ItemTypical RangeNotes
Field inspection + written reportFreeYours to keep; delivered within 24–48 hrs
Engineer-stamped structural letter$400–$900Through our Louisiana-licensed PE partners
Manufactured-home foundation certification$450–$950HUD-compliant, with elevation certificate where required
Rush turnaroundNo surchargeCall it out on the form; closings don't wait
📄 Deal under a deadline? Send the closing date when you book. We've turned reports around inside 48 hours for Barksdale relocations more times than we can count.

Book an Inspection Report

Mention your closing date — we schedule around it.